View Full Version : Tower Construction 1/26-1/27 2008


5678TA
01-23-2008, 01:00 PM
The Second Floor Is Already In. The Masons Are Coming In On Thursday And Saturday To Finish The Walls. Hopefully We Can Grout On Monday. We Are In Need Of Electricians And Carpenters To Start With The Wiring And To Help Build The Roof . Portions Of The Roof Will Be Built On The Ground To Help Speed The Process. If You Can't Come Out To Help There Are Others Ways To Help. DONATIONS ARE BEING ACCEPTED BY MARK CAIRES OUR TREASURER. THE MONEY WILL BE USED FOR TRACK IMPROVEMENTS. THANK YOU VERY MUCH!!!!!!!! 8:00 AM- ??????
Items Needed: 1) 12/2 Romex Wire : 5 Rolls
2) 8 Foot Flourescent Fixtures Single Pole Ends :12 Ea
3) 8 Foot Flourescent Bulbs Single Pole Ends : 24 Each.
4) Light Switches Single Pole (white): 6 Each
5) Three Way Switches (white): 2 Each
6) 20 Amp Outlets (white Or Grey) : 30 Each
7) 1 1/2" Grey Electrical Conduits 10 Feet Long: 150 Each
8) 1 1/2 " Grey Electrical Conduit 90 Degree With One Female End
Call Ray At 268-2306 Or Alan At 281-6606

M. CAIRES #808
01-23-2008, 01:14 PM
Monetary donations can be mailed to:
VITA
PO Box 330490
Kahului, Hawaii, 96733
Thank You.

BLKDRGN
01-24-2008, 07:42 AM
we visited this past Saturday. sorry we couldn't help as we ran out of time. this is the only picture i took.

Char Vowell
01-25-2008, 07:00 PM
we visited this past Saturday. sorry we couldn't help as we ran out of time. this is the only picture i took.


Andy, Chuck and Al were over there working then...!